πŸ—οΈ 였늘의 건섀 μ˜μ–΄ (2025λ…„ 10μ›” 15일 · μˆ˜μš”μΌ)

by LTS1107 2025. 10. 15.
λ°˜μ‘ν˜•

πŸ—οΈ 였늘의 ν‘œν˜„ 1

The concrete must cure for at least 28 days before loading.

μ½˜ν¬λ¦¬νŠΈλŠ” ν•˜μ€‘μ„ λ°›κΈ° 전에 μ΅œμ†Œ 28일 λ™μ•ˆ μ–‘μƒλ˜μ–΄μ•Ό ν•©λ‹ˆλ‹€.

πŸ’‘ μ£Όμš” 단어

  • cure: μ–‘μƒν•˜λ‹€
  • loading: ν•˜μ€‘ μž‘μš©
  • at least: μ΅œμ†Œν•œ

πŸ—οΈ 였늘의 ν‘œν˜„ 2

The retaining wall shows signs of lateral movement.

μ˜Ήλ²½μ—μ„œ μΈ‘λ°© λ³€μœ„μ˜ μ§•ν›„κ°€ λ‚˜νƒ€λ‚©λ‹ˆλ‹€.

πŸ’‘ μ£Όμš” 단어

  • retaining wall: 옹벽
  • lateral movement: μΈ‘λ°© λ³€μœ„
  • signs of: ~의 μ§•ν›„

πŸ—οΈ 였늘의 ν‘œν˜„ 3

All site workers must wear reflective safety vests.

λͺ¨λ“  ν˜„μž₯ κ·Όλ‘œμžλŠ” λ°˜μ‚¬ μ•ˆμ „μ‘°λΌλ₯Ό μ°©μš©ν•΄μ•Ό ν•©λ‹ˆλ‹€.

πŸ’‘ μ£Όμš” 단어

  • reflective vest: λ°˜μ‚¬μ‘°λΌ
  • site worker: ν˜„μž₯ 근둜자
  • must wear: λ°˜λ“œμ‹œ μ°©μš©ν•˜λ‹€

πŸ—οΈ 였늘의 ν‘œν˜„ 4

We conducted a plate load test to check the bearing capacity.

μ§€μ§€λ ₯을 ν™•μΈν•˜κΈ° μœ„ν•΄ ν‰νŒμž¬ν•˜μ‹œν—˜μ„ μˆ˜ν–‰ν–ˆμŠ΅λ‹ˆλ‹€.

πŸ’‘ μ£Όμš” 단어

  • plate load test: ν‰νŒμž¬ν•˜μ‹œν—˜
  • bearing capacity: μ§€μ§€λ ₯
  • conduct: μˆ˜ν–‰ν•˜λ‹€

πŸ’¬ 였늘의 λŒ€ν™”

A: The soil seems soft near the footing.
B: Let’s increase the compaction and run another test.

A: 기초 μ£Όλ³€ 흙이 μ•½ν•΄ λ³΄μ΄λ„€μš”.
B: 닀짐을 μ’€ 더 ν•˜κ³  μ‹œν—˜μ„ λ‹€μ‹œ 해보죠.

πŸ’‘ μ£Όμš” 단어

  • footing: 기초
  • compaction: 닀짐
  • run a test: μ‹œν—˜μ„ μˆ˜ν–‰ν•˜λ‹€

 